Q:The civic administration plans to introduce a ''best from waste'' project along with a debris collection system to reuse the material to produce bricks, flower pots, decorative material and murals.
Latest Answer: Hi everybody,
I am personally appreciating this move as it will less the pollution in the city. As of now, the administration has identified the locations where it will for setting up the plant. The tenders to running the facility will be issued, after the elected members give a clearance. The agency would collect the material from the designated spots and transport it to the plant.
Latest Answer: Yes, and as per A CSE analysis, it is estimated that as much as 530 million tonnes of construction and demolition waste is generated annually. The waste is inert, but bulky. It is either dumped in city landfills or in open spaces, water bodies and flood plains.
Q:Construction and Demolition Waste Rules, 2016 have been notified in suppression of Municipal Solid Waste (Management and Handling) Rules, 2000 w.e.f. 29th day of March 2016 Whereas Municipal Solid Waste (Management and Handling) Rules, 2000 were applicable on Municipality(s), Construction and Demolition Waste Rules, 2016 has extended the responsibility of waste management and related compliance to waste generator, service provider, contractors, constructor of buildings and Municipality(s).
Latest Answer: Hi friends,
We can say that it was unscientific dumping and because of that there is an increase in pollution in tier-1 cities. These are not actually waste but resources. The basis of this new rules is to recover, recycle and reuse. We can use those waste to make tiles, pipes from it.