Latest Answer: Yah, like the ISKON temple authorities have been paid close to rupees 6 crores by the authorities of the Hyderabad Metro Rail, so that the HMR can pass through their property.
Q:Hey, I have heard recently that the L&T is still facing road blocks and is still having some problem regarding the alignment of the route? Any updates on this?
Latest Answer: L&T facing a cost overrun of as much as Rs.3,000 crore on account of high interest cost and delays in execution. L&T has so far spent Rs.4,800 crore on the project, of which its equity contribution was Rs.1,500 crore.
Latest Answer: The administrators are being very thoughtful about the whole procedure, They are considering the future needs and plans of Indian Railways, including running of double decker trains, the Metro ROB works are carefully planned and at some places the Metro ROBs will cross the railway bridges at double elevation
Latest Answer: L and T came up to this conclusion on the cost by considering the facts such as the dismantling that must happen; of which there are 21. Apart from this there were the surveying, the soil testing, the delay caused which would all matter.