Q:Hello, How is the progress of the GHMC pits for rain water harvesting going. I think the summer is very near and it has to be completed soon. What is happening here?
Latest Answer: GHMC to encourage collection of roof top rain water, filter it and storage of filtered water through over head tanks. I am ready to construct about 20 KL overhead tank and necessary system to collect the roof top rain water, filter it and pump it to over head tank even though the plot size is 300 Sq.yds. This water will help the residents for fire fighting purposes also. If really GHMC officials are interested in real sense, I am prepared to meet. My cell nos is 9866115177. A message in this regard is solicited from GHMC. NG Raju