Q: The connected load in our apartment (HT connection) is more than the sanctioned load. The builder didn't bother about this before applying for the power connection the first time. What is the procedure involved and how much time does it take ?

Latest Answer: The Connected load is the total load that a consumer can impose on the electrical system if everything was connected at one time. Sanctioned load is the total load sanctioned on electrical system by concerned authority (BESCOM). BESCOM penalizes if unauthorized load is either not removed or extra sanctioned load is not obtained.You can apply for temporary supply or extra connected load in a prescribed form to the O & M Section / Sub-Division Office of the Licensee. No registration fee needed. You have to pay Rs 50 service charges per Installation and advance estimated power consumption charges at the prevailing rate.

You can contact your builder or owners' association for further details and write an application to BESCOM or KERC.

Ask a Question
120 Characters Left





    Trending Categories

    CommonFloor Property Search Mobile App now available on Android, iOS and Windows!