Latest Answer: Actually, there are a lot of things that have to be done before the piling works for the flyover will begin. I think that a good share of land for the flyovers has been handed over to DMRC, except for two plots. Timely handling over of full extent of land is crucial for relocating pipelines and cables before piling.
Latest Answer: what the repair works are doing is that the concrete wearing course will be broken and re-laid with the proper gradient and drains so that water can seep away. I think there will also be a 25 mm layer of mastic asphalt that will be laid manually..and the rest of the work then..